Chenab Rail Bridge, An Engineering Marvel ( Post 1 )

 

Having the distinct record of being India's highest Railway bridge, the Chenab Railway Bridge  is nothing short of an engineering marvel that blows one's mind with varied technical details, miscellaneous factors, sheer man power required, coming together of various government departments for coordination, expert and experienced personnel; be it the engineering department, design team, execution workers / agencies and a constant fight against inhospitable terrain, extreme and risky weather conditions in the Himalayas, logistic factors that required massive pre-work of building roads leading up to the point, that include tunnels of 63 km length and 7.5 km of bridges.


Here are a few details regarding the same. 

Cost - ₹ 1,486 Crores 

River - Chenab

State - Jammu and Kashmir

District- Reasi

Region - Bakkal and Kauri

Range - Pir - Panjal

Links - Katra and Banihal

Height - 1178 feet, from the river bed to the formation and 1056 feet from the river surface

Length - 4314 feet / 1415 m that includes  2,130 feet long viaduct on the northern side

Material - 63 mm Thick, Blast - proof Steel

Number of Spans - 17

Designers - DRDO, Konkan Railways, Afcons Infrastructure

Construction Company - Mumbai based Afcons Infrastructure

Number of Workers involved - More than 1300

Number of Engineers involved - 300

Major Institutions Involved include DRDO, Indian Institute of Sciences, Bangalore, IIT - Delhi, IIT - Rourkee, GSI, National Remote Sensing Agency among others 

Railway Zone - Northern Railways 

Number of Villages Connected - 73 

Part Of USBRL - Jammu - Udhampur - Srinagar - Baramulla Railway Line 

USP - Connects the State of Jammu and Kashmir with the rest of the country

Design Life - 120 + years 

Start of the Project - December, 2003

Open to public / Inauguration - 13 August 2022, on the occasion of Azadi ka Amrut Mahotsav


The engineering of the bridge was something that had not been attempted in such a unique Himalayan terrain and posed a huge challenge right from the envisioning stage and then on to its implementation meticulously to the T.

Major Features of the Bridge include -

  • 36 m long approach spans

  • 469 m main arch spans across the river

  • 480 m arch length

  • 1.2 m wide central verge

  • 14 m wide dual carriage-way

  • Can withstand wind speed upto 260 km / hour

  • Can withstand an earthquake measuring up to magnitude 8 ( Highest intensity - Zone V )

  • Can withstand a blast of up to 40 kg TNT blast 

  • Can resist temperatures up to - 20℃ 

  • 24 hours online monitoring and warning system managed by the DRDO along with the Indian Railways

  • Aerial security 

  • An approach road of 26 kms had to be constructed first to reach this point 

  • It is 35 m higher than the Eiffel Tower, Paris, France

  • Having the longest span in the 5 ft 6 in  / 1,676 mm broad gauge railway network

  • Material used include up to 4000mt of reinforced steel, 25,000MT of steel,  46,000m³ of concrete

  • Need of Eight million cubic metres of excavation.

  • World's largest cable cranes used 

  • Footpath and cycle trails 

  • Repainting period - 15 years 


Continued…..Click here for the second part of the post 


Images - Wikipedia and www.architecturaldigest.in